Risk Register & Assessment

Inherent Risk Matrix

IMPACT (5-1)
1 2 3 4 5
LIKELIHOOD (1-5)

* Click on a cell in the heatmap to filter the risk table by score coordinates.

Risk Matrix Guidelines

Risk Formulas

  • Inherent Risk: Likelihood × Impact (1 - 25)
  • Residual Risk: Inherent Risk - Control Reduction

Action Thresholds

  • Score ≥ 20: Critical (Immediate attention)
  • Score ≥ 12: High (Remediate in 30 days)
  • Score ≥ 6: Medium (Plan mitigation)
  • Score < 6: Low (Monitor status)

Compensating Reduction Model: Mapped controls default to a 40% reduction weight to likelihood score in residual calculation, simulating functional control defense against external threats.

Risk Inventory

Risk ID Risk Description Control Reference Inherent Score Residual Score Mitigation Status Actions